tigercannon71 wrote:It shouldnt take that long to put it down like a month or a lil longer.
I watched the installation at Burg a couple years ago, it is an impressive project. It all depends on weather. All of the excavating and drainage is what takes the time and can be held up by rain. From the time the first piece of turf was laid until the rubber pellets were laid was almost a month exactly. I would say they spent at least 3-4 weeks doing the excavating, so waiting so long to start is going to make a tight window, but it can be done as long as it is a relatively dry summer.